People counting installation that produces figures you can trust is mostly done before installation day. Ceiling height, entrance width, sunlight, power points and the network all decide which sensor model to use, how many, and where to mount them. If the survey misses something, the problem shows up during installation or after go-live: cables cannot be run, the network blocks data from leaving, or the total is short by one entrance. This article is a checklist for the facilities and IT teams of malls and retail chains: what to survey, what documents to prepare, and who in the organisation needs to be involved. If you have not chosen a technology yet, read the people counting buying guide first. This article focuses on ceiling-mounted 3D sensors, the type IMAS uses.

Start with the Question, Not the Sensor
Before walking the site, agree on what you want to know. The question decides where you need to count.
| What you want to know | Where you need to count |
|---|---|
| How many people enter the mall or store each day | Every entrance and exit, without missing a single one |
| How many people are in the building right now (occupancy) | Every entrance and exit, counting in and out separately |
| How many passers-by enter the store | The walkway in front of the store, and the store door |
| How far people spread to upper floors | Escalators, passenger lifts and stairways between floors |
| Which zones people stay in longest | The whole area of the zone, not just its entrance |
| The store's conversion rate | The store door, plus transaction counts from the point-of-sale system |
Typical sensor positions in shopping centres are covered in What Is Footfall, and the conversion rate calculation is explained in conversion rate for physical stores.
Site Survey Checklist: 8 Areas
1. Entrances and Exits: Count Every One
List every entrance and exit from the floor plans, then walk the site to check. Plans often no longer match the current site.
- Main and secondary entrances, including links to rail stations, car parks and neighbouring buildings
- Entrances open only at certain times, such as doors used only at weekends or a restaurant-zone entrance that stays open late
- Staff doors and goods-delivery routes. Decide whether to count them. If staff walk through customer entrances, plan how to exclude staff from the start
- The real width of each entrance. Measure edge to edge across the walkable opening. A wide entrance may need several sensors linked together
2. Ceiling: Height, Type and Obstructions
Each 3D sensor model is designed for a specific mounting-height range. For example, according to Xovis data, the PF-L mounts at 2.00–6.00 metres, the PC2SE at 2.20–6.00 metres with a low-ceiling variant, and the PC3SE serves high-ceiling halls up to 20 metres. The area a sensor sees grows with height. A model comparison table is in How a 3D People Counting Sensor Works.
What to record on survey day
- Actual height at the mounting point. Measure from floor to the ceiling surface at the exact spot. Do not use slab-to-slab height from drawings, because ceiling levels vary from section to section
- Ceiling type. Smooth gypsum board, a lay-in grid ceiling with removable tiles, or an open ceiling with exposed services. The last may need a drop pole or bracket to bring the sensor to the right level
- Space above the ceiling. Is there room to run cables, which panels need opening, and are there access hatches?
- Obstructions below the ceiling. Hanging signs, light fittings, air diffusers, sprinkler heads, pipes, or seasonal decorations that will be hung later
- Maintenance access. High atriums may need a boom lift or scaffolding. Know from the start how the equipment will be serviced
3. Light and Environment
- Sunlight through glass doors. Note what time of day the sun shines straight into the entrance, and how much a polished floor reflects
- Dark areas. According to Xovis specifications, the PF-L and PC2SE need a minimum of 2 lux. Check actual lighting at car-park entrances or back corridors where lights are switched off at times
- Temperature and humidity. Xovis indoor models operate at 0–45 °C and 20–80% non-condensing humidity. For semi-outdoor entrances, forecourts, or spots where steam from restaurants rises, consider an outdoor model
- Doors moving in the field of view. Swing doors, revolving doors or air curtains in the counting area require count lines placed clear of them
How each technology copes with site conditions is compared in 6 types of door people counters.
4. Power: Power over Ethernet or a Separate Supply
Most 3D sensors take power over the same network cable that carries their data, known as Power over Ethernet (PoE). According to Xovis specifications, the PF-L uses PoE to the IEEE 802.3af standard or USB-C and draws up to 12.95 W, while the PC2SE draws up to 7.5 W.
What facilities and IT should check together
- A PoE switch. Is one already in place or does it need to be supplied, and is the switch's total power budget enough for the number of sensors?
- Cable runs. Network cable has a maximum run length under the standard. If the network room is far from the entrance, you may need an extra switch cabinet near the mounting points
- Backup power. If counting must continue through power dips, check whether the switch is on an uninterruptible power supply
5. Network: Where the Data Goes
IT is often where installation gets delayed if nobody talked to them first. Points to agree
- Ports and network segments. Will sensors join the existing network, or a separate virtual LAN (VLAN) for IoT devices?
- Outbound data. Xovis sensors can push data over several channels, such as HTTP(S), FTP(S), SFTP, MQTT(S), TCP and UDP, and offer a documented API. IT needs firewall rules that let data out to the agreed destination
- Remote configuration. The installation team needs access to configure and maintain the devices. Agree an access method that IT approves
- Device time. Hourly data can be matched with sales only if the sensor clock and the point-of-sale clock agree
- Network outages. According to Xovis specifications, the sensor can store data on the device for up to 3 years, depending on the number of counters configured, so the data stays on the device while the network is down
6. Mounting Points, Count Lines and Zones
- Place count lines away from where people stand and wait, such as in front of a door where people wait for friends, or by a bag-check point
- Link several sensors into one field. Wide entrances or large zones use several sensors together. According to Xovis, each sensor's area must overlap the next by at least 30 centimetres, and from 10 sensors upwards a central processing unit is recommended
- Allow for layout changes. If you know a door will move, a shopfront will be refitted, or a permanent booth will be set up, tell the installation team in advance, because count lines must match the actual layout
7. Privacy and Personal Data
The 3D sensors IMAS uses process data on the device and output text data only, with no personally identifiable information. Before installation, it is still worth agreeing the following with your data protection officer or legal team
- Which privacy level the sensors will be set to
- Whether add-ons such as gender or age estimation will be switched on or off
- How visitors will be informed, in line with your organisation's policy
Read more in People Counting and PDPA, which covers Thailand's Personal Data Protection Act.
8. Where the Data Goes Next
- Dashboards. Who will use them, and do access rights need to be split by branch or by tenant?
- Sales data. To see conversion rate, find out how the point-of-sale system can supply hourly transaction counts
- Other company systems. A central reporting system or building management system that needs to pull data through an API
Who Should Be Involved from Survey Day
People counting installation touches many teams. Inviting them all to the survey cuts rework later.
| Team | Prepares | Decides |
|---|---|---|
| Management or data users (marketing, operations, leasing) | The questions they want answered | Where to count and which metrics to use |
| Facilities and engineering | Floor plans, reflected ceiling plans, rules for working at height and opening ceilings | Mounting points, cable routes, when work can take place |
| IT | Network diagram, network room locations, security policy | Network segments, firewall rules, remote access method |
| Data protection officer or legal | The organisation's personal data policy | Privacy level, add-ons to enable, how to inform visitors |
| Security | Duty rosters and checkpoints | Site access for the installation team |
| Branch managers or tenants | Quiet periods, information on staff doors | When installation can happen without disturbing customers |
| Landlord (for stores leasing space in a mall) | Rules for alterations to leased premises | Permission to open ceilings and run cables |
Stores leasing space in a shopping centre should get permission from the centre's facilities team first, because ceilings and cable routes are usually under the landlord's control.
Documents to Prepare Before Survey Day
- Floor plans and reflected ceiling plans, the latest versions that match the site
- Photos of every entrance, both wide shots and shots looking up at the ceiling, with width and height noted
- Network diagram, showing the network room and the switch cabinet nearest each entrance
- Contact list for each team in the table above
- Opening hours and site-access rules, such as whether work must happen outside opening hours and whether a work permit is needed
- Known renovation plans, such as moving a door or refitting in the near future
After Installation: Check the Figures Before Trusting Them
Installation is not the end. CountMatters, the developer of the XPERIO platform, sets out its service steps as: define requirements, adapt the solution, install, validate, and provide ongoing support. Validation means counting by hand at the hardest point, such as the main entrance at a busy time, and comparing that with the system's figures period by period. The test method is described in the people counting buying guide.
Once in use, re-check whenever the site changes, for example when a door moves, a booth is set up near an entrance, or light fittings under a sensor are replaced.
Common Mistakes When Preparing a Site
- Forgetting secondary entrances. A car-park link or side door missing from the drawings keeps the total permanently low
- Using heights from drawings. Not measuring at the mounting point leads to a model outside its height range
- Talking to IT too late. The devices are installed but cannot send data because firewall rules are not yet open
- No plan for staff. Staff walking through customer entrances all day distort footfall and conversion rate
- Not asking the landlord. A tenant store is ready but has no permission to open the ceiling
- Not sharing layout plans. The shopfront changes right after installation, so sensors must be moved or count lines redrawn
How IMAS Helps Prepare the Site and Install People Counting
- 3D people counting uses ceiling-mounted 3D sensors to count people entering a space in real time and track dwell time and crowded spots. The IMAS team helps choose models that fit the real ceiling height and entrance width, and places sensors, count lines and zones around your questions
- XPERIO dashboard brings data from every entrance and every branch into one place, compares daily to yearly, and passes data to reporting or other business systems through an API
- See use cases by sector on the shopping malls and retail chains pages
Survey findings help the team choose equipment and design the system. Deciding which points to count first, and what to do with the figures, stays with the people who know the site and the business goals.
Frequently asked questions
−What should we prepare before installing a people counting system?
The questions you want answered, the latest floor plans and reflected ceiling plans, photos of every entrance, a network diagram, and contacts from facilities, IT and the team responsible for personal data.
+Can people counting sensors be mounted on very low or very high ceilings?
Yes, if the model matches. 3D sensors come in low-ceiling and high-ceiling-hall versions. The key is to measure the actual height at the mounting point.
+Do we need new power cabling for every sensor?
Not always. Most 3D sensors take power over the network cable (PoE) that also carries data. Check that the network switch can supply enough power.
+What does IT need to prepare?
Network ports near the mounting points, a network segment for the devices, firewall rules that let data out to the agreed destination, and a remote access method for configuration and maintenance.
+Can a store leasing space in a mall install the system itself?
It should ask the centre's facilities team for permission first, because ceilings and cable routes are usually under the landlord's control.
Want to Know How Ready Your Site Is for People Counting?
The IMAS team helps survey the site, choose sensor models, plan positions, and coordinate with your facilities and IT teams. Details and costs are provided in a quotation.
References
- Xovis AG. Technical Datasheet PF-L (V1.5) and Technical Datasheet PC2SE. Website xovis.com
- Xovis AG. Selection Guide, Metric (V1.9, July 2026). Website xovis.com
- CountMatters AS. People Counting. Website countmatters.com
- IEEE Std 802.3af-2003. Data Terminal Equipment (DTE) Power via Media Dependent Interface (MDI)